Installation for M-Sorb

 

1.Measure the area size to estimate how many M-Sorb to be used.

 

2.Clean up the area wanted to be installed.

 

3.Place glue on the back of M-Sorb sheet and leave 10-15 minutes.

 

4.Place glue on the installed area and leave 10-15 minutes.ี

 

5.Attach M-Sorb sheet throughout  the area firmly and neatly

 

6.Recheck the completion for any corrections needed.

 

 

 

M-PE INSULATION© 2007
Home  |  Products  |  Installation   |  Reference  |   About Us